|
1
|
- A component of the
- CONNOR Compliance System
|
|
2
|
- CCS ACM Components
- Abatement, O&M, and Fiber Release Management
- Quarterly Signage Inspections
- Annual ACM Inspections
- Contractor Notification
- Asbestos Reports
|
|
3
|
- Navigate to www.connorsolutions.com
- Log in with your username and password
- Click Asbestos Management to enter the ACM module main menu
- To return to this ACM main menu at any time
- Click Main Menu on the far left
- Click Asbestos Management
|
|
4
|
- Click Manage Abatement/O&M/Fiber Release Activities to get started
- Select the property being managed
- A list of the existing activities is displayed
|
|
5
|
- To add, click the Add button
- To edit, click the Edit button
- To delete, click the Delete button
- When adding or editing, the activity details screen is displayed
|
|
6
|
|
|
7
|
- Type –
- O&M Activity
- Abatement
- Fiber release
- Start Date – Date the activity began
- End Date – Date the activity ended
|
|
8
|
- Contractor Used – Checked if a third-party contractor performed the
work, unchecked if not
- Contractor Name – If a third-party contractor was used, the name of that
contractor
|
|
9
|
- Air Monitoring
- Not Performed
- Passed – If clearance air levels are < .01 f/cc
- Failed - If clearance air levels
are > .01 f/cc
- Must Pass to reoccupy unit
- Air Monitoring Contractor – If air monitoring was performed, the name of
the contractor who performed the air monitoring
|
|
10
|
- Waste Generated
- Checked if waste was generated, unchecked otherwise
- Waste Bags
- Number of waste bags generated
- Waste Pickup By
- The company that picked up the waste bags
- Waste Pickup
- Date the waste bags were picked up
|
|
11
|
- State Project # - the state project number
|
|
12
|
- Documents
- Files that relate to the activity
- To upload a document via fax
- Navigate to the CCS main menu
- Click Fax Document Upload Cover Sheet
- Print and complete the CCS fax upload cover sheet
- Fax the cover sheet and document to the number specified on the cover
sheet
|
|
13
|
- Costs – the costs for the various categories
- Description/Notes – General notes about the activity
|
|
14
|
- Used to specify which ACM locations are included in the activity
- Include quantity information
- Accessible by clicking the Material Locations link at the top of the
activity screen
|
|
15
|
|
|
16
|
- Available Column
- Shows all ACM Locations
- Groups can be expanded
- Expand the Building to see the Areas
- Expand the Area to see the Materials
- Expand the Material to see the Rooms that contain it
- Included Column
- Shows ACM Locations included in activity
|
|
17
|
- Select the material location to add
- Select the Building to add all locations in the building
- Select an Area to add all locations in the area
- Select the Material to add all locations of the material in that unit
- Select the Room to add the material from that room
- Click Add (à)
|
|
18
|
- Enter the quantity/description
- Select the material in the Included grid
- Enter the quantity (complete or dimensions)
- Enter the description
- Click Save
|
|
19
|
- Used to track
- Who worked on the activity
- Respirator usage
- Accessible by clicking the Employees link at the top of the activity
screen
|
|
20
|
- To add an employee to the activity
- Select the person from the drop-down list
- Click Add
- To show all employees (not just maintenance staff), click Show All
Employees
|
|
21
|
- To add a new employee to the system
- Select <Add New>
- Enter the person’s name and email
- Check the position(s) for the person on the property
- Only employees with maintenance roles will show as options on the
activity screen
|
|
22
|
- Only Employees covered by the company’s Respirator Protection Program
may use respirators.
- To enter respirator usage for an employee
- Select the employee in the grid
- Click Respirator Usage
|
|
23
|
- The usage for the person on this activity is listed in the grid at the
bottom.
- To add a day of usage
- Select the date
- Specify if usage was >= 1 hour
- Click Add
- To delete usage
- Select it in the grid
- Click Delete
|
|
24
|
- Return to the Activity Details screen
- Click Save
|
|
25
|
- From the ACM main menu, click Quarterly Signage Inspections
- Select the property
- A list of existing inspection is displayed
|
|
26
|
- To add
- To edit an existing inspection
- Select it in the grid
- Click Edit
- To delete
- Select it in the grid
- Click Delete
|
|
27
|
|
|
28
|
- General Information
- Displayed at the top of the screen
- Date of inspection
- Inspector - person performing inspection
|
|
29
|
- Inspection Findings
- Displayed at the bottom
- To add
- Enter location, condition, and action taken
- Click Add Finding
- To delete
- Select the finding in the grid
- Click Delete Finding
- Click Save when finished
|
|
30
|
- Sent via email
- Sent until inspection is complete
- Reminder schedule dependent upon Client needs
|
|
31
|
- From the ACM main menu, click Annual ACM Inspections
- Select the property
- A list of existing inspection is displayed
|
|
32
|
- To add
- To edit an existing inspection
- Select it in the grid
- Click Edit
- To delete
- Select it in the grid
- Click Delete
|
|
33
|
|
|
34
|
- All ACM materials are listed in the grid on the left.
- Checked the Inspected box for those materials that are included in the
inspection.
|
|
35
|
|
|
36
|
- Used to specify where the material was found to be damaged
- Select the material in the grid on the left
- Expand each building and check the areas where the material was observed
to be damaged
|
|
37
|
- Used to notify a third-party contractor of ACM
- Sent via email or electronic fax
- From the ACM main menu, click Send Contractor Notification
|
|
38
|
- Select the property
- Select the delivery method (Email or E-Fax)
- For email, enter the contractor’s email address
- For fax, enter the contractor’s fax number
- Full 10-digit fax number
- No spaces, dashes, or parenthesis
|
|
39
|
- Enter email addresses you’d like to be CC’ed in the CC box (note that
you will already be CC’ed automatically)
- Enter the name of the contracting company in the Recipient Name box
- Click Preview to review the notification
- Click Send to send the notification
|
|
40
|
|
|
41
|
- ACM Summary Report
- ACM
- Presumed ACM
- Abatement status with link to details
|
|
42
|
- Quarterly Signage Inspection History
- Inspections listed by date
- Expand a date to view inspection details
|
|
43
|
- Abatement/O&M/Fiber Release Activity Cost Summary
- Can be run for a specific date range
- Summary by property
- Shows costs by category
- Has a detail link for viewing activities
|
|
44
|
- Abatement/O&M/Fiber Release Activity Summary
- Locations by property with activity date
- Has a link for viewing details
|
|
45
|
- Abatement/O&M/Fiber Release Activities by Area
- Lists buildings on the property
- Expand buildings to view materials and abatement details
|
|
46
|
- Abatement/O&M/Fiber Release Activities by Material
- Lists ACM on the property
- Expand ACM to view locations and abatement details
|
|
47
|
- Contractor Notification History by Property
|
|
48
|
- Contractor Notification History by Contractor
- Lists all contractors notified
- Expand each contractor to see notifications
|
|
49
|
- Respirator Usage Summary
- Displays a list by employee of respirator usage days within the last 12
months
|
|
50
|
- Contact tech support by:
- Phone: 678-333-7383
- Email: softwaresupport@connorsolutions.com
|